Intermediate frequency electric furnace safety operation procedures

Intermediate frequency electric furnace safety operation procedures
1, check things out before blowing in electrical equipment, water cooling system, sensor brass etc are in good condition, otherwise prohibited furnace.
2, furnace melting in excess of the prescribed shall promptly repair. It is strictly prohibited in melting too deep inside the crucible for melting.
3, sending and furnace should have someone who's in charge, after sending it is forbidden to contact sensors and cables. On duty shall not leave post, pay attention to the sensor and external circumstance of crucible.
4, loading, should check harmful items such as burden in presence of flammable and explosive mixed with, if you have to remove timely, it is forbidden to cold and wet material directly add to the liquid steel, melted liquid filled with first division after it is forbidden to chunk is expected to join in case cover.
5, and tamped crucible, scrap iron, iron oxide are forbidden to mix, rammed crucible must be compact.
6, pouring fields and official pit furnace should have no obstacle, no water, in case the steel landing explode.
7, molten steel are not allowed to dress too full, hand carry bags when pouring, two of them should be conformed to walk should be smooth, not allowed to walk fast abrupt stop, after pouring yu gang in a designated place, it is forbidden to dump.
8, intermediate frequency generator room should be kept clean, it is strictly prohibited flammable and explosive goods and other debris into indoor, indoor smoking ban.